
| Drive | Hydraulic |
| Application | Offshore wind cofferdams, urban piling |
| Eccentric moment | Per model — sized to pile |
| Clamp type | Universal hydraulic clamp |
| Noise/vibration profile | Reduced vs. impact hammers |
| Lead time | 10–14 weeks |
Hydraulic vibratory hammers built for cofferdam piling on offshore wind foundations and sheet piling in urban construction, one of the products we manufacture in-house.
The vibratory driving method reduces noise and structural vibration compared with impact hammers, useful on sites with nearby structures or environmental noise limits.
Sized and clamp-configured to your pile section — talk to our engineers about matching eccentric moment to soil conditions.
Send us the spec and destination and we'll come back with a quote.